Projects Services News About Materials Contacts

EY

office interior

THE TOTAL SQUARE 2 500 м2

ADDRESS Sadovnichaya em-t, 77/1

ENGINEERING 2013

CONSTRUCTION 2013


About Project

The entrance groups of the 2nd (central) and 3rd (service) entrances of BC "Aurora", as well as the premises between them, fell under the reconstruction.

It was necessary to create comfortable representative areas and a capacious conference center, to fill the space with transformable and multimedia elements.

All creative principles are already formulated in the central reception area. It is a luminous volume with elements of tinted glossy glass. Behind the counter there is a voluminous "portal" of rhythmically decreasing vertical bars with dynamic illumination. Illumination scenarios are based on corporate customer standards, they can be changed depending on tasks and moods. On the embedded screens, corporate videos are shown. Completing the solution is a lamp of complex shape, invented by the famous designer Karim Rashid.

Other projects

Europark
When you enter, you discover a completely enchanting gallery without any columns - an actual shopping street, lit by a skylight.
Europark
The urban context defined the volumetrics and the floor-plan layout unusual for a shopping mall: irregular foot-print shape and curved facades.
Fleming/United CIty Bank
A prestigious location in Moscow, a Kremlin view, high ceilings, a variety of existing volumes and an unusual engineering solution resulted in airiness and clarity for the new space.