THE TOTAL SQUARE 1 300 м2

CLIENT Medtronic

ADDRESS 18, Krasnopresnenskaya Emb., block C, 19th floors

ENGINEERING 2008

CONSTRUCTION 2008


About Project

One of the main directions of the world’s leading company in the field of medical technology is cardiology. The complex «Naberezhnaya Tower» (block C) accommodates one of its 20 training centers. Given the specifics of the company, the architects developed a strict, clean interior that will be relevant for years to come. Various elements of the lighting design play an important role. The reception zone and the lift lobby are separated through a corridor.

The main wish of the customer was to make the training hall big and maximally functional. Sliding partition allows the training hall to be split into three parts, which could be used for lectures and meetings. To work with surgical equipment a special deaf «operation room» was designed.
Opinions
Elena Plyasunova,
Finance and Administration Manager
Due to internal situation the project was put on hold a few times. However, it was amazing how promptly ABD architects could re-join at each project phase with a great deal of professionalism. All project milestones were met thanks to excellent project management skills of ABD architects. What was very important that even beyond design/planning stages the project team continued to monitor the progress and meticulously managed the construction team making sure that they stick to the original design at maximum.