Projects Services News About Materials Contacts

WILO

factory
Moscow region
LEED
atrium
LEED Gold certificate

THE TOTAL SQUARE 6 000 м2

ADDRESS Moscow region, Noginsk

ENGINEERING 2015-2016

CONSTRUCTION 2016


About Project

The main idea was to reflect in the interior the image of the water, with WILO pumps work.

For this purpose, the atrium ceiling was designed with steel panels, whose design resembles a water surface, when you look at it from below.



The central staircase as if overgrown with underwater plants, hiding massive structure. Coming into the atrium people figurally speaking fall into the pool. the The fountain in the center of the lobby completes this experience and fills the room with the sound of flowing water, glare and makes the air more humid in the atrium and enjoyable. The rest of the office space designed as transparent as possible, and the atrium can be seen everywhere.

Other projects

CADENCE DESIGN SYSTEMS
Brightness, dynamics, simplicity and openness are office space characteristics for the innovative IT company.
Center of Financial Technologies
CFT develops software for banking institutions, and conducts trainings to work with them.
Chaika Office building
The building is located in the southern part of Moscow, between one of the main highways, Warsaw highway, and Novodanilovskaya embankment of the Moscow river, on a plot of 4.99 hectares that is a part of a rehabilitated industrial zone.